Repairing an existing home

An ordinary purchase loan may require a property to meet its condition standards before closing. A renovation product can combine an eligible purchase or refinance with improvement costs. FHA’s 203(k) program uses a rehabilitation escrow and controlled disbursements rather than handing the buyer an unrestricted renovation budget.

Standard 203(k) serves major rehabilitation, while Limited 203(k) is for more limited, nonstructural work. Standard transactions require an FHA-approved consultant; a consultant may also be used with Limited transactions. Confirm the current cost limits and project eligibility against the applicable handbook and lender. This guide avoids an undated dollar cap because public summaries can lag program changes.

One closing or two?

Construction-to-permanent financing can use one closing that establishes the construction and permanent terms, or two separate closings. In the Fannie Mae single-closing framework, the lender manages construction disbursements and the loan converts after completion under the documented terms. Required completion and conversion conditions still matter.

A two-closing arrangement uses separate construction and permanent loans. The second loan has its own underwriting, and may involve a different lender. That creates a question worth answering before signing the construction contract: what happens if the permanent rate rises, the final value is lower or the household’s income changes? A hoped-for refinance is not a committed permanent loan.

Build a budget that includes uncertainty

In a fictional renovation, a $60,000 contractor bid plus a $9,000 contingency, $3,000 in consultant and inspection charges and $6,000 of temporary housing produces a $78,000 project budget. Not every line is necessarily eligible for financing. Ask the lender to mark each item as financed, paid from cash, or excluded. Keep the same items out of the budget’s other categories to avoid duplication.

An additional $12,000 hidden structural repair would exceed the $9,000 contingency by $3,000. If that excess must be paid before the next draw, a borrower who has no cash reserve can face a stalled project even though the original loan was approved. The amount a lender will finance and the cash you need while work is underway are separate questions.

Who approves the work and releases money?

Get the written scope, contractor agreement, required permits, inspection schedule, draw rules and completion deadline before closing. Ask whether materials deposits can be funded, how change orders are approved, who verifies work, and whether lien waivers are required. Do not assume that a contractor’s preferred payment schedule matches the lender’s draw procedure.

Also establish the monthly carrying cost while work is underway: construction interest, the existing rent or mortgage, taxes, insurance and utilities. Ask the insurer how a vacant or actively renovated property must be covered. A financing estimate that ignores six months of duplicate housing costs can make a project look much cheaper than it is.

Scope changes and overruns may call for a different project

Structural work, a major scope change, unsupported after-completion value, an ineligible contractor, or inability to fund overruns can change the product or make waiting sensible. Compare buying a move-in-ready home, staging nonessential improvements, and repairing an existing home without replacing a favorable first mortgage.

Next, obtain a lender-reviewed scope and a realistic cash schedule before making a financing-dependent commitment. Compare all-in acquisition and project costs, expected permanent debt, monthly carrying costs and a delay case. Keep the contractor agreement and financing conditions aligned so neither assumes money or timing the other has not promised.

203(k), HomeStyle or CHOICERenovation?

Match the project before the loan label
ProgramWhat it connectsExecution question
FHA 203(k)Eligible purchase/refinance and rehabilitation, with improvement funds controlled through escrowDoes Standard or Limited fit the scope, and is a consultant required for this project?
Fannie Mae HomeStyle RenovationConventional renovation financing with lender-reviewed plans and an as-completed appraisalWho controls draws, contingency funds, completion inspection and final lien clearance?
Freddie Mac CHOICERenovationEligible purchase or no-cash-out renovation financing; LPA underwritingDoes the underlying mortgage, property and contractor process fit this lender’s offering?

Do not confuse renovation financing with unrestricted cash-out or a ground-up construction commitment. Combining a renovation option with HomeReady, Home Possible or HomeOne does not remove the underlying program’s occupancy, unit, income or underwriting limits. Availability depends on the lender offering and administering the product.

Ask each lender to mark the same contractor budget: eligible financed work, required cash, contingency, temporary housing, permits, consultant/inspection charges and unpaid overruns. For a $60,000 project, an extra $10,000 cash requirement matters even if the mortgage payment looks similar. Ask what happens to unused escrow, who approves a change order, whether a contractor deposit can be paid before work, and what happens when work misses its deadline. Compare the total plan against completing a smaller project without replacing an inexpensive first mortgage.

Check the current draw process before funding work

HUD Mortgagee Letter 2026-06, effective June 23, 2026, changed Limited 203(k) draw procedures. Limited loans can use up to four draws per contractor under the described process. The letter also clarifies multiple disbursements within a draw; Standard’s maximum remains five draw requests. An older “two draws” description should not be used as the current Limited rule. HUD Mortgagee Letter 2026-06 — draw procedures

Have the lender identify the applicable program, completion conditions, inspection process and documentation before a contractor expects payment. An escrow balance is not unrestricted cash. Fannie Mae HomeStyle separately governs contingency funds and how unused renovation money is handled after completion. Fannie Mae B5-3.2-04 — HomeStyle costs and escrow accounts

For a private investor bridge, model the actual advance schedule in the rehab cash ledger. Program-controlled draws and a private lender’s draw contract are not interchangeable.

Who covers a repair before the next draw?

Suppose a $12,000 repair has $8,000 released after inspection. The $4,000 gap still needs a documented funding source and timing. Ask who approves changes, when the remaining draw can be released and who pays an overrun.

Check how much household cash can remain available.

Sources and review dates

The dates below show when we checked each source. Our worked examples use fictional figures. We identify official samples by their publisher.

What the review covered

Introduction edited November 22, 2026. We edited the introduction and reordered the guide. Each source keeps its original check date. We did not recheck every financial or legal rule in this edit.

AI tools helped us prepare and edit this guide. Your lender, tax adviser or lawyer can help you apply the rules to your situation. How we check sources and correct errors.